Pre-treating a slab is the cheapest termite work you will ever buy on a house, and the only time you can put a continuous chemical barrier under a building without cutting concrete to do it. Once the pour goes down, every square foot you skipped becomes a drilling job later.

What a pre-construction treatment actually is

The work happens in stages that track your build schedule, not in one visit. After the pad is graded and the footings or grade beams are formed, the exposed soil inside the foundation perimeter gets a measured application of liquid termiticide — horizontal coverage across the fill, heavier vertical treatment down the inside of footings, around pier blocks, and at every plumbing stub, conduit sleeve and utility penetration coming up through the slab. Those penetrations are where Formosan subterranean termites most often find their way in, because a pipe boot shrinks away from concrete as the slab cures and leaves a gap no inspector will ever see. After the slab is poured and the building is framed, the exterior perimeter is trenched and rodded to tie the outside soil into the same barrier. On raised and pier construction, which is still common on the lower lots around New Orleans, the emphasis shifts to the piers, the backfill against them, and keeping the barrier continuous where a slab-on-grade porch or stoop meets the main structure.

Many builders here add a borate wood treatment to the framing package before insulation and drywall go in — sill plates, studs, sheathing, roof decking. That is a different product doing a different job: the soil barrier stops termites coming up from the ground, the borate makes the wood itself a poor meal if they arrive another way, including the alates that fly in and land on an exposed frame during May and June swarms. The two are complementary, and on a house in a neighborhood with a known Formosan history, both are worth the money. These termites have been established in the city since the 1950s and are the most destructive species we deal with — the USDA has put the control and repair bill for New Orleans at around $300 million a year, and almost none of that is spent on houses that were treated properly before the slab went down.

New construction pest pre-treatment covers more than termites if you want it to, and the extra items are genuinely different work rather than add-ons to the same spray. Fire ants usually arrive in imported fill dirt and sod, so that treatment is timed to final grading and landscaping, not to the slab stage. Carpenter ants are a moisture-and-wood-contact problem, which means the fix is as much about grading, flashing and keeping lumber off wet ground during the build as it is about chemistry. American cockroaches come up through sewer laterals and shelter in construction debris, so the useful intervention is sealing and cleanup before closing, plus treatment of the crawl or slab perimeter.

Timing, and what goes wrong

The single most common failure is a missed window. Treatment has to go down on soil that is ready to be covered, and the vapor barrier and concrete need to follow before heavy rain moves the product. In a wet spring, a job treated Thursday and poured the following Tuesday after four inches of rain is not a treated job, and a company that will not come back and re-treat has sold you paperwork. Other failures: skipping the interior fill because a crew could not get access around rebar, treating at a diluted rate to stretch material, and no retreat of soil disturbed afterward by plumbers, electricians or a late patio pour. Ask who is responsible for calling for a re-treat when trades dig, and get the treatment documentation — product, concentration, gallons applied, linear and square footage, date — before you pay. That record follows the house to closing and to any future warranty claim.

Cost, and booking it

Price is driven by square footage of slab, linear feet of footing and perimeter, how many separate visits your schedule forces, whether you add borate framing treatment, and whether the lot's drainage and access let a crew work efficiently. Estimates are free, so the honest way to price it is to have someone look at your plans and your site.

T-800 Termite Terminators takes enquiries by phone, Monday to Friday 8AM–6PM and Saturday 8AM–1PM. Call as soon as you have a pour date; same-day service is available when a schedule moves on you, which on an active site it usually does.

Ready for Pre-Construction Treatment?

Share the project details and ask about the next available appointment.

Call now

Other Services We Offer